    What is the expected frequency of pipeline maintenance in the Wind Farm Zone and what is the expected maintenance time?

    1 answer

      • Dia de Wijs
        • Public

        Dia de Wijs 162 days ago

        Pipeline operator Wintershall Noordzee B.V has indicated the following frequency of planned surveys. Expected maintenance time varies from a few hours to a day. However, if the pipelines become exposed due to the influence of the wind farms, the frequency of surveys could change in the future.

        Pipeline

        Frequency

        Next survey planned in

        P6-B to P6-A 

        4Y

        2021

        P6-D to P6-B

        4Y

        2021

        P9-AB to P6-D

        4Y

        2021

        P6-C to P6-B

        4Y

        2021

        P6-S to P6-B

        4Y

        2021

        P12-SW to P6-A

        2Y

        2021