    Will existing gas pipelines be used to transport energy for the IJmuiden Ver wind farms?

    1 answer

      • Dia de Wijs
        • Public

        Dia de Wijs 207 days ago

        Non-electrical energy transmission options have been considered for the 4 GW offshore wind farm IJmuiden Ver but were assessed as not being feasible in time at the necessary scale and cost level. Therefore, only electrical energy options are considered in the permitting process for the transmission connections.