    In section 5.3.3 on page 51 in the Project & Site Description it is stated that: “Decommissioning can start latest end of year 25 and should be completed within two years maximum after the power generation operations have stopped, but at the latest in the 30th year.”
     
    Can you clarify if the sentence is correct or should it state “Decommissioning can start no earlier than end of year 25…”?

    1 antwoord

      • WOZ_RVO.nl
        • Iedereen (publiek zichtbaar)

        WOZ_RVO.nl 180 dagen geleden

        The description in the Project and Site Description (PSD) is not correct. The sentence:

        “Decommissioning can start latest end of year 25 and should be completed within two years maximum after the power generation operations have stopped, but at the latest in the 30th year.”

        Must be replaced by:

        “Decommissioning can start end of year 25 earliest and should be completed within two years maximum after the power generation operations have stopped, but always within the term of the validity of the permit, in this case in the 30th year.”

        We will correct the PSD accordingly.